Fifth Settlement (Beit Al Watan)
Price Start From 3,000,000 L.E
Details :
El Massar Development
Established in 2006
16 years in the market
Very respectable work history:
- 16 towers in the Central Plateau, all of them occupant, except for one tower that is currently in the finishing stage
- 5 buildings in Gardenia Heights
- 3 villas in Andalusia
- 3 villas in East Academy, 2 villas in Banafseg, and 5 villas in Investors
- Mall in the first settlement
All buildings are built without violations at all
The building consists of a guard room, tractors, and stores only
Construction according to the agency’s regulations and with the best types of facade finishes that are resistant to weathering and erosion
The best types of insulation for heat and humidity
Use the best types of aluminum for windows
Use armored doors for the main door of apartments
Surveillance cameras surrounding the building
• Specifications of the unit’s external finishing:
1- Fully imported electric elevator and its components from the basement to the roof.
2- Surveillance cameras on the facade and entrances.
3- Imported marble entrances and stairs and weather-insulating paint.
4- Air conditioning racks and drains.
5- Visual/digital intercom.
6- Garage drainage + garage preparation, helicopter floors + automatic doors.
7- Alumetal for facade windows.
8- Central shower.
9- Main door to the property.
10- Roof insulation (humidity + heat) + rain drainage.
11- Security and guarding (security room in the garage + bathroom).
12- Elsewedy Cables - Smart Exchange.
• Specifications of the unit’s interior finishing:
1- Concrete walls and ceilings and concrete floors.
2- Armored apartment door.
3- Establishing electricity and plumbing.
4- Electricity meter.
5- Internal loops for the unit.
6- Flat slab roof.
7- Water tanks.
Payment plan up to 6 years
Address
Features
Contract Data
Contract : Sell
Type : Apartment
Status : Under Construction
Real estate Data
Rooms : 3
Bathrooms : 3
Garage : 1
Sqft : 2000
Garage
Garden